Double arbor vertical shape saw

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11772294
APP PUB NO 20200238562A1
SERIAL NO

16852363

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of a system for shape sawing wood may include a feed unit and a saw box pivotably coupled to, and suspended from, one end of the feed unit. The saw box may be coupled to the side walls of the feed unit by pivot pins that define a rotational axis. A motor may be mounted to one side of the saw box to drive a saw arbor in rotation. The system may include an actuator that is selectively actuable to pivot the saw box about the rotational axis relative to the feed unit. Another actuator may be provided to move the saw box laterally along the pivot members. The feed unit may be slideably mounted on rails and selectively movable along the rails relative to a feed axis that extends through the saw box and the feed unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
U S NATURAL RESOURCES INC1981 SHURMAN WAY WOODLAND WA 98674

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bullion, Conrad LaCenter, US 11 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 3, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00