Apparatus for and method of producing ultrafine bubble-containing liquid, and ultrafine bubble-containing liquid

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11772005
SERIAL NO

17178487

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a method of producing an ultrafine bubble-containing liquid containing ultrafine bubbles generated by causing film boiling in a liquid with a heat generation member, including: detaching a solid present at a liquid contact surface of the heat generation member in a form of a microscopic substance by using the film boiling; and generating ultrafine bubbles with the detached microscopic substance as a core.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CANON KABUSHIKI KAISHA30-2 SHIMOMARUKO 3-CHOME OHTA-KU TOKYO 146-8501

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Imanaka, Yoshiyuki Kanagawa, JP 183 2225
Ishinaga, Hiroyuki Tokyo, JP 210 3598
Kashino, Toshio Kanagawa, JP 187 3445
Kubota, Masahiko Tokyo, JP 167 1718
Ozaki, Teruo Kanagawa, JP 132 1705
Yamada, Akitoshi Kanagawa, JP 304 3154
Yamamoto, Akira Kanagawa, JP 924 13286
Yanai, Yumi Kanagawa, JP 57 232

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 3, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00