Direct dental bridge

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11771532
APP PUB NO 20180368955A1
SERIAL NO

16062956

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An impression taker captures an impression of preparation cut in abutment teeth. The impression taker includes; a rigid body supporting a first arm and a second arm. The first arm has a first longitudinal end configured to take an impression of a preparation cut in a first abutment tooth, and the second arm has a second longitudinal end configured to take an impression in a second abutment tooth. In addition, a reinforcement combination supports a dental bridge and an elongate proximal bar supports a dental bridge. The impression taker and the reinforcement bar combination can be used to produce a direct dental bridge.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MORRIS CHRISTOPHERBRAMPTON ONTARIO L6Y 0M5

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Morris, Christopher Brampton, CA 24 91

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 3, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00