Method for the hybrid construction of multi-piece parts

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11766722
APP PUB NO 20210017868A1
SERIAL NO

17061553

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-piece part includes multiple pieces fabricated via different types of fabrication processes, wherein the multiple parts are configured to be coupled to one another to form the assembly. At least one of the multiple parts is fabricated via an additive manufacturing method. The multi-piece part also includes a holder assembly that couples and holds together the multiple pieces of the multi-piece part, wherein the holder assembly comprises a reversible, mechanical-type coupling.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barnell, Steven J Pelzer, US 2 11
Cui, Yan Greer, US 229 1510
Kottilingam, Srikanth Chandrudu Simpsonville, US 217 1526
Schaeffer, Jon Conrad Greenville, US 73 633
Schick, David Edward Simpsonville, US 85 786
Tollison, Brian Lee Honea Path, US 102 439

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00