Linear head module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11764660
APP PUB NO 20220399794A1
SERIAL NO

17837080

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A linear head module includes: a plurality of linear motors each including a mover having an output shaft portion; a plurality of detection portions each configured to detect a position of the respective output shaft portion in a direction of a thrust axis; a single circuit board provided with the plurality of detection portions; and a detected portion provided to the respective mover, the detected portion is fixed to the mover via a mounting base, and as viewed in the direction of the thrust axis, a direction in which the mounting base extends from the output shaft portion is different from a direction in which the output shaft portion and the circuit board face each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SANYO DENKI CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inaba, Satoshi Tokyo, JP 67 2728
Misawa, Yasushi Tokyo, JP 28 143
Onda, Yuki Tokyo, JP 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00