System for controlling power in a facility

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11764606
SERIAL NO

17454351

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for controlling power in a facility having an electrical system including a generator and an associated fuel tank. The fuel tank provides fuel to the generator and has a gauge indicating remaining fuel. The generator is electrically connected to the electrical system. A first power consuming device imposes a first load connected to the electrical system of the facility and second power consuming device imposes a second load connected to the electrical system of the facility. The system receives information related to the loads and calculates an initial estimated run time of the generator given the remaining quantity of fuel and information related to the first load and information related to the second load. The system selectively removes the second load in a simulation and calculates a second run time of the generator given the remaining quantity of fuel and information related to the first load.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNITED SERVICES AUTOMOBILE ASSOCIATION (USAA)9800 FREDERICKSBURG ROAD SAN ANTONIO TX 78288

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Martin, Raymond Frederick San Antonio, US 2 0
Mueller, Mark Scott Universal City, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00