Lightning protection spark gap assembly and method for operating a lightning protection spark gap assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11764570
SERIAL NO

17606866

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a lightning protection spark gap assembly. The lightning protection spark gap assembly comprises: a lightning protection spark gap (1); a safety fuse device (8) which can be triggered by a bridge initiator (7) and which is connected between a first or second voltage line (S1, S2) and a corresponding main connection (1, 1b) of the lighting protection spark gap (1); and an indicator device (4′) for detecting a secondary current flow connecting to a pulse current flow or a corresponding portion of the secondary current flow, and for triggering the safety fuse device (8) by activating the bridge initiator (7) when the detected secondary current flow or the corresponding portion of the secondary current flow fulfills a first predefined criterion, wherein the lightning protection spark gap (1) has a first and a second divergent electrode (21a, 21b) and an arcing chamber (25), and wherein the indicator device (4′) is electrically connected to the first or second divergent electrode (21a, 21b) and/or the arcing chamber (25) in such a way that it detects the secondary current flow or the corresponding portion of the secondary current flow in the area (L) in which the secondary current arc flows.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEHN SEHANS-DEHN-STRASSE 1 NEUMARKT I D OPF 92318

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bühler, Klaus Neumarkt, DE 8 6
Ehrhardt, Arnd Neumarkt, DE 22 232

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00