Method of forming structure having coating layer and structure having coating layer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11764057
APP PUB NO 20220375748A1
SERIAL NO

17327786

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of forming a structure having a coating layer includes the following steps: providing a substrate; coating a fluid on the surface of the substrate, where the fluid includes a carrier and a plurality of silicon-containing nanoparticles; and performing a heating process to remove the carrier and convert the silicon-containing nanoparticles into a silicon-containing layer, a silicide layer, or a stack layer including the silicide layer and the silicon-containing layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHE INC11F -6 NO 235 ZHONGZHENG 4TH RD QIANJIN DIST KAOHSIUNG CITY 801648

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Chun-Hung New Taipei, TW 246 1469
Cheng, Yin-Wei Kaohsiung, TW 5 21
Huang, Jun-Han Changhua County, TW 4 2
Li, Yi-Chang Changhua, TW 4 2
Liu, Chuan-Pu Tainan, TW 16 91
Peng, Bo-Liang Kaohsiung, TW 3 2
Wang, Shih-An Taipei, TW 4 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00