Method for rapidly measuring roller pass major semi-axis of three-roller reducing mill

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11761746
APP PUB NO 20230074692A1
SERIAL NO

17792496

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for rapidly measuring the roller pass major semi-axis of a three-roller reducing mill to improve the outer-diameter precision and surface quality of a steel pipe includes selecting a corresponding value of the average diameter of an elliptical pass, a value of a first major semi-axis, and a value of a minor semi-axis according to a rack station number of a special numerical control lathe; calculating a value of a first line segment according to an elliptic equation, the obtained value of the first major semi-axis, and the obtained value of the minor semi-axis; calculating a value of a second major semi-axis according to the right-angle triangle theorem and the value of the first line segment; and measuring a value of the first dimension by attaching three claws of a three-claw internal micrometer to three roller gaps.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAYE SPECIAL STEEL CO LTDHUANGSHI HUBEI 435001

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cao, Hua Hubei, CN 28 65
Huangfu, Youli Hubei, CN 1 0
Wu, Jun Hubei, CN 507 5138
Xie, Fan Hubei, CN 10 48
Zhang, Housheng Hubei, CN 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00