Fastening element

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11761218
APP PUB NO 20210285242A1
SERIAL NO

16321453

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A scaffolding element having a scaffolding pole, at least one fastening element being disposed or formed on the scaffolding pole. The fastening element preferably has a fastening element body. The fastening element body can be L-shaped. Preferably, the free end of the fastening element body points straight upwards when the scaffolding element is in the mounted state. A projection is disposed or formed below the free end on the fastening element body, in particular in a section parallel to the longitudinal axis of the scaffolding pole. The projection can be part of a U-shaped bead.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PERI SE89264 WEISSENHORN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Andree, Juergen Neu-Ulm, DE 3 3
Endriss, Philip Voehringen, DE 2 0
Probstle, Rene Koetz, DE 1 0
Steck, Tobias Weissenhorn, DE 10 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00