Towing hook attachment structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11760143
APP PUB NO 20210221187A1
SERIAL NO

17096153

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A first crossmember is divided into a right crossmember and a left crossmember. A right fastened portion of a towing hook is inserted into the right crossmember, and a bolt is fastened by being passed through a bolt insertion hole of the right crossmember and a bolt insertion hole of the right fastened portion of the towing hook. A left fastened portion of the towing hook is inserted into the left crossmember, and a bolt is fastened by being passed through a bolt insertion hole of the left crossmember and a bolt insertion hole of the left fastened portion of the towing hook. Hereby, the attachment strength of the towing hook can be secured sufficiently, and even in a case where an input at the time of towing of a vehicle is excessive, the towing can be performed successfully.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asai, Tetsuya Miyoshi, JP 21 123

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00