Method for producing a veneer from rattan, veneer sheet, and molded component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11759971
APP PUB NO 20210129373A1
SERIAL NO

16605184

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a veneer in the form of a veneer sheet, wherein the method includes the following method steps: a) providing a plurality of rattan rods having tubules extending longitudinally, b) producing profiles from the plurality of rattan rods, the tubules extending in the longitudinal direction of the profiles, c) connecting the profiles to form a main body, wherein the profiles are arranged within the main body in such a way that the tubules extend in the longitudinal direction and/or transversely to the longitudinal direction and/or at a predefinable angle to the longitudinal direction of the main body, and d) cutting the main body produced in step c), the veneer sheet being obtained. A moulded component is also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OFS - BETEILIGUNGS - GMBH HOLDING88353 KISSLEGG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Koehn, Moritz Kisslegg, DE 1 0
Kraft, Peter Kisslegg, DE 10 73
Reuter, Julian Wolfegg/Roetenbach, DE 1 0
Wurster, Felix Kisslegg, DE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00