Ultrafine bubble generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11759755
APP PUB NO 20230055123A1
SERIAL NO

17793365

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fine bubble generator which is an ultrafine bubble generator includes a side wall whose inner face is cylindrical, and closing walls closing both ends of the side wall, respectively, with a gas-liquid discharge port in one of the closing walls, wherein a fluid inlet port is provided closer to the gas-liquid discharge port than is a midpoint between both closing walls, and the fluid inlet port penetrates the side wall in a tangential direction of the inner face of the side wall, wherein a spiral groove is formed in the inner face of side wall, and wherein the spiral groove has an angle of inclination of 1° to 10°.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AKITA UNIVERSITY1-1 TEGATA GAKUEN-MACHI AKITA-SHI AKITA 010-8502
AKIMOKU IRON WORKS CO LTD1-29 KANKOBATA OUGIDA NOSHIRO-SHI AKITA 0160122

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakagawa, Akira Noshiro, JP 252 3838
Sugiyama, Wataru Akita, JP 81 681

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00