Combine header with split augers and method of using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11758850
APP PUB NO 20210092902A1
SERIAL NO

16934317

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A harvesting assembly for harvesting a crop includes a frame, a cutting knife configured to cut crop, a feed drum, a draper assembly, a first auger assembly, and a second auger assembly. The draper assembly and the auger assemblies are configured to move the cut crop toward the feed drum. The auger assemblies each include a first auger, a second auger, and a mounting unit coupled to the frame and coupled between the first auger and the second auger to support the first auger and the second auger during rotation of the augers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEERE & COMPANYONE JOHN DEERE PLACE MOLINE IL 61265

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bomleny, Duane M Geneseo, US 64 322
Freehill, Justin C Fenton, US 10 14
Kane, Lawrence F Geneseo, US 1 1
Kumar, Sumit Fatahabad, IN 120 995
Parthasarathy, Balaji Bettendorf, US 21 493
Pellegrini, Eric Hans Pierre Sarreguemines, FR 1 0
Pierson, Joshua R East Moline, US 19 112
Yanke, Bryan R Eldridge, US 32 152

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00