Electronic circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11757433
APP PUB NO 20220376682A1
SERIAL NO

17881034

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A spike generation circuit includes a first CMOS inverter connected between a first power supply and a second power supply, an output node of the first CMOS inverter being coupled to a first node that is an intermediate node coupled to an input terminal to which an input signal is input, a switch connected in series with the first CMOS inverter, between the first power supply and the second power supply, a first inverting circuit that outputs an inversion signal of a signal of the first node to a control terminal of the switch, and a delay circuit that delays the signal of the first node, outputs a delayed signal to an input node of the first CMOS inverter, and outputs an isolated output spike signal to an output terminal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JAPAN SCIENCE AND TECHNOLOGY AGENCYKAWAGUCHI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yajima, Takeaki Tokyo, JP 14 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00