Receptacle connector socket with embedded bus bar

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11757223
APP PUB NO 20220336981A1
SERIAL NO

17230712

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An information handling system may include a printed circuit board and a plurality of connectors each electrically and mechanically coupled to the printed circuit board, each connector of the plurality of connectors configured to receive a respective modular information handling resource in order to electrically couple, via electrically-conductive pins of such connector, the respective modular information handling resource to the printed circuit board. Each connector may include a body comprising electrically non-conductive material and including a receptacle formed therein for receiving a mating edge connector of the respective modular information handling resource, a bus bar comprising electrically conductive material, other than the electrically-conductive pins of such connector, disposed within or upon the body and extending through at least a portion of the body, and an electrical termination electrically coupled to the bus bar.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CREDIT SUISSE AG CAYMAN ISLANDS BRANCH7033 LOUIS STEPHENS DRIVE PO BOX 110047 RESEARCH TRIANGLE PARK NC 27709

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hartman, Corey D Hutto, US 28 696
Lambert, Timothy M Austin, US 175 1182
Wang, Isaac Q Austin, US 39 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00