Pumped thermal storage cycles with turbomachine speed control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11754319
APP PUB NO 20220042720A1
SERIAL NO

17509341

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides pumped thermal energy storage systems that can be used to store electrical energy. A pumped thermal energy storage system of the present disclosure can store energy by operating as a heat pump or refrigerator, whereby network input can be used to transfer heat from the cold side to the hot side. A working fluid of the system is capable of efficient heat exchange with heat storage fluids on a hot side of the system and on a cold side of the system. The system can extract energy by operating as a heat engine transferring heat from the hot side to the cold side, which can result in network output. Systems of the present disclosure can employ solar heating for improved storage efficiency.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MALTA INCCAMBRIDGE MA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cizek, Nicholas Cambridge, US 16 601
Larochelle, Philippe Cambridge, US 47 1488
Laughlin, Robert B Cambridge, US 18 816

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00