Flare gas system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11754283
SERIAL NO

17227673

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The flare gas system has a flare gas assembly having an air pipe with an open upper end, a first conduit in surrounding relationship to the air pipe and having a first conduit open upper end, a second conduit in surrounding relationship to the first conduit and having a second conduit upper end, and a third conduit in surrounding relationship to the second conduit and having a third conduit upper end, the upper ends of the air pipe, the first conduit and the second conduit being below the upper end of the third conduit, there being an air source connected to the air pipe to provide air to the air pipe at a desired flow rate. There is at least one second flare gas assembly operatively connected to the first flare gas assembly, the second flare gas assembly having a tubular housing in which is mounted a spring biased orifice plate, the tubular housing being in open communication with the annulus formed below the second and third conduits.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BACON DAVIDBASTROP TX

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bacon, David Bastrop, US 18 77

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00