Short fiber-reinforced concrete structure using continuous fiber-reinforced polymer material
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Sep 12, 2023
Grant Date -
May 12, 2022
app pub date -
Jan 31, 2020
filing date -
Apr 8, 2019
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A concrete structure includes a continuous fiber-reinforced polymer material arranged as a main reinforcing material or a tendon. A short fiber reinforcing material consisting of an organic fiber is mixed in 0.5% or more with respect to an entire volume. The continuous fiber-reinforced polymer material is shaped like a rod or a stranded wire. A ratio Lf/Gm between a fiber length Lf of the organic fiber of the short fiber reinforcing material and a maximum aggregate diameter Gm of a concrete composition is 1.2 to 3.7, and an aspect ratio Lf/De, in which De is an equivalent diameter that is a cross-sectional area of the organic fiber converted into a circle diameter, is 30 to 69.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
TOKYO ROPE MFG CO LTD | TOKYO 135-8306 | |
ORIENTAL SHIRAISHI CORPORATION | 5-6-52 TOYOSU KOTO-KU TOKYO 135-0061 |
International Classification(s)

- 2020 Application Filing Year
- C04B Class
- 1327 Applications Filed
- 696 Patents Issued To-Date
- 52.45 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Ishii, Tomohiro | Tokyo, JP | 104 | 1127 |
# of filed Patents : 104 Total Citations : 1127 | |||
Koda, Eiji | Tokyo, JP | 6 | 47 |
# of filed Patents : 6 Total Citations : 47 | |||
Tanaka, Toru | Tokyo, JP | 237 | 1692 |
# of filed Patents : 237 Total Citations : 1692 | |||
Tanaka, Yoshihiro | Tokyo, JP | 125 | 1284 |
# of filed Patents : 125 Total Citations : 1284 | |||
Tsunomoto, Meguru | Tokyo, JP | 2 | 3 |
# of filed Patents : 2 Total Citations : 3 | |||
Watase, Hiroshi | Tokyo, JP | 6 | 88 |
# of filed Patents : 6 Total Citations : 88 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 1 Citation Count
- C04B Class
- 85.69 % this patent is cited more than
- 2 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Mar 12, 2027 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Mar 12, 2031 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Mar 12, 2035 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
Date | Code | Event | Description |
---|---|---|---|
Apr 26, 2022 | P | Publication | |
Apr 06, 2022 | STCF | INFORMATION ON STATUS: PATENT GRANT | free format text: PATENTED CASE |
Mar 31, 2022 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED |
Dec 30, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS |
Nov 29, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
Oct 27, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: ADVISORY ACTION MAILED |
Oct 20, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: RESPONSE AFTER FINAL ACTION FORWARDED TO EXAMINER |
May 19, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: FINAL REJECTION MAILED |
May 01, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
Dec 30, 2020 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NON FINAL ACTION MAILED |
Oct 17, 2019 | P | Published | |
Dec 27, 2018 | AS | ASSIGNMENT | free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SKLADMAN, RAMI;BUBLITSKY, RON;KORACH, HAIM;AND OTHERS;SIGNING DATES FROM 20170718 TO 20170720;REEL/FRAME:047861/0129 Owner name: ISRAEL AEROSPACE INDUSTRIES LTD., ISRAEL |
Dec 27, 2018 | FEPP | FEE PAYMENT PROCEDURE | free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
Jun 28, 2017 | F | Filing | |
Jun 30, 2016 | PD | Priority Date |

Matter Detail

Renewals Detail
