Method for the construction of a data center

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11753346
SERIAL NO

17126970

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for the construction of a data center, includes (a) providing a fresh concrete composition including a paste that includes a hydraulic binder, a mineral addition and water, the paste being present in a mixture with sand and aggregates, whereby the paste is present in the concrete composition in a volume of <320 L/m3 and/or the solid volume fraction of said paste is >50 vol.-% and (b) placing the fresh concrete composition so as to build walls, a floor and/or a ceiling of the data center, which are intended to surround the individual components of computer systems, which are housed in the data center.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HOLCIM TECHNOLOGY LTDGRAFENAUWEG 10 ZUG 6300

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Creyx, Antoine Holderbank, CH 5 2
Levy, Christophe Holderbank, CH 8 17
Peuchlestrade, Anthony Holderbank, CH 3 0
Toussaint, Fabrice Holderbank, CH 7 26
Wise, Joanne Holderbank, CH 1 0
Zhang, Qing Holderbank, CH 406 3556

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00