Micro-energy acquisition device and micro-energy acquisition method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11750038
APP PUB NO 20220294268A1
SERIAL NO

17828779

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A micro-energy acquisition device is provided. The radio frequency circuit generates a ground voltage according to the micro-energy voltage and output the ground voltage through the ground terminal; the first unidirectional conduction component makes the ground voltage to be unidirectionally conductive to generate the first voltage; the microprocessor generates the supply voltage according to the first voltage and is operated according to the supply voltage; the first input/output port of the microprocessor is connected with the first unidirectional conduction component; since the microprocessor and the radio frequency circuit are connected in series, an electrical energy consumption speed of the micro-energy voltage is slower, the capability of data transmission is improved and an error rate of data transmission is reduced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WU WENJINGNO 18 XIHONGPO VILLAGE CHANGQI TOWN WUCHUAN ZHANJIANG GUANGDONG 524531 ZHANJIANG CITY GUANGDONG PROVINCE 524531

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wu, Wenjing Guangdong, CN 24 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00