Retention mechanism for attachment of technical equipment unit to a mounting rail and technical equipment unit with such a retention mechanism

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11749973
SERIAL NO

17412479

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A retention mechanism for attaching equipment to a mounting rail comprises a slider including a first retention section and a pivoting lever mechanical coupled to the slider. The slider is movable in a translational manner along a sliding direction with respect to a remaining portion of the retention mechanism. The lever includes a second retention section aligned with the first retention section in the sliding direction. A reception area for receiving the mounting rail is defined between the first retention section and the second retention section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TE CONNECTIVITY GERMANY GMBHAMPERESTRASSE 12-14 BENSHEIM 64625

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aboulkassem, Mohamed Bensheim, DE 8 31
Kreutz, Friedhelm Bensheim, DE 3 3
Ofenloch, Markus Bensheim, DE 6 14
Zimmer, Frank Bensheim, DE 10 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00