Method for manufacturing fuel cell stack body and method for manufacturing fuel cell stack

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11749823
SERIAL NO

17476068

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a fuel cell stack body includes a step of forming a plurality of line-shaped separator cross-sectional patterns. In the patterns, a first direction along the build surface is the stacking direction, and a second direction orthogonal to the first direction is the planar direction of the separators. The patterns extend in the second direction and meander so as to have convexities and concavities in the first direction. The manufacturing method further includes a step of forming the electrolyte membrane cross-sectional pattern and a step of forming the electrode cross-sectional patterns. These steps are repeated to perform stacking in a direction perpendicular to the build surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONDA MOTOR CO LTD1-1 MINAMI-AOYAMA 2-CHOME MINATO-KU TOKYO 107-8556

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nagamine, Shingo Tokyo, JP 6 29

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00