Multi-stage turbocharging compressor for fuel cell systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11749818
APP PUB NO 20230044056A1
SERIAL NO

17819564

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An aircraft power plant for a fuel cell including a turbo assembly, a compressor assembly, a turbo assembly, a compressor assembly controller, a first stage turbo assembly and compressor assembly operation configured to generate a first stage compressed fluid generated from ambient air and excess oxygen exhausted from a fuel cell of an aircraft power plant. A second stage turbo assembly and compressor assembly operation configured to receive the first stage compressed fluid, and a controller bleed valve coupled with the first stage turbo assembly and compressor assembly and the second stage turbo assembly and compressor assembly. An oxygen supply system, the oxygen supply system fluidically coupled with the first stage turbo assembly and compressor assembly wherein a first compressed oxygen is generated by the first stage turbo assembly is combined with a second compressed oxygen generated by the second stage turbo assembly to generate a combined oxygen controlled by the controller bleed valve. A third stage turbo assembly and compressor assembly operation configured to receive the combined oxygen, and a hydrogen supply system configured to provide hydrogen fluidically coupled with the third stage turbo assembly and compressor assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZEROAVIA INC90 SKYLANE DRIVE HANGAR 1 HOLLISTER CA 95023

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miftakhov, Valery San Carlos, US 50 491

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00