Modular manufacture, delivery, and assembly of nuclear reactor building systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11746550
SERIAL NO

17234581

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nuclear reactor is constructed in sub-modules and super modules which are manufactured, packaged, and shipped to a construction site. At least some of the modules are packaged in suitable shielding containers or portions of containers, which may be steel. The modules are assembled on-site, and some of the modules remain within their respective shipping containers after assembly. One or more of the shipping containers may be used as concrete forms to support the pouring of concrete in between selected modules. The concrete may be used for structural support, shielding, or both.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TERRAPOWER LLC15800 NORTHUP WAY BELLEVUE WA 98008

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bass, Derek Wilmington, US 17 29
Dimitri, Michael F Leland, US 3 5
Johnson, Brian C Issaquah, US 19 401
Kaneko, Calen Seattle, US 8 14
Martin, Christopher A Seattle, US 13 272
Mosier, Sean T Wilmington, US 7 2
Schloss, Philip M Seattle, US 6 6
Smith, Nathan Duvall, US 110 1400
Werner, Mark R Bellevue, US 10 80

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00