Guide device for a rapier bar and rapier weaving machine comprising such a guide device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11746449
APP PUB NO 20220220645A1
SERIAL NO

17606748

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A guide device including a guide (1) with one or more guide elements (2) for guiding a rapier bar (3) in a rapier weaving machine, wherein this guide device is provided with an air circuit (5) through which compressed air can flow and which is provided with perforations (7) for cooling the rapier bar (3) by compressed air, and wherein this guide device is provided with a cooling circuit (8) through which coolant can flow for cooling the rapier bar (3) by coolant. In addition, an assembly of a rapier bar (3), drive (4) and such a guide device. Furthermore, a rapier weaving machine including such an assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VANDEWIELE NV8510 KORTRIJK / MARKE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bruynoghe, Koen De Pinte, BE 13 20
Halsberghe, Brecht Kuurne, BE 6 16
Maes, Geert Gullegem, BE 4 28
Verscheure, Diederik Bruges, BE 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00