Three part mixing process for energetic materials and epoxy binder

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11746068
APP PUB NO 20190270683A1
SERIAL NO

16290200

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to methods of preparing pre-mixed compositions that can be combined to form pyrotechnic compositions. In exemplary embodiments, a binder ingredient is premixed with the pyrotechnic fuels and can also include other pyrotechnic additives and processing aides. Other binder ingredients can be premixed with the pyrotechnic oxidizers and can also include other pyrotechnic additives and processing aides. The resulting mixtures are not explosive and are therefore easier to store and much safer to handle. These pre-mixed mixtures can be stored in bulk until needed and rapidly combined to achieve final composition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE UNITED STATES OF AMERICA AS REPRESENTED BY THE SECRETARY OF THE NAVYWASHINGTON DC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shaw, Anthony P Madison, US 7 4
Yamamoto, Christina Bloomington, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00