Reinforced polygonal container made of glued corrugated laminar material, production method and machine for forming same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11745909
APP PUB NO 20200346814A1
SERIAL NO

16753041

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a polygonal container comprising a tubular polygonal body (10) with an even number of flat faces (11) numbering more than four, which is formed by a strip of corrugated cardboard (19) rolled up at least two full turns and adhered to itself by means of lines of glue (30) transverse to the channels of the corrugated cardboard, forming a multilayer wall (13); a base body (20) defined by a base panel of cut and folded stiff double-faced corrugated cardboard (24) attached around an end portion of the tubular polygonal body (10). The method comprises forming the tubular polygonal body by means of rolling the strip of corrugated cardboard around a polygonal rotary drum (51) and subsequently attaching to a base body (20).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TELESFORO GONZÁLEZ MAQUINARIA SLU03204 ELCHE/ELX ALICANTE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gonzalez, Olmos Telesforo Santa Pola, ES 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00