Method of manufacturing semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11740259
SERIAL NO

17679770

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An inspection terminal provided in a test device has a main body portion including a support portion that is curved; a plate-shaped portion integrally connected to the support portion and extending in a first direction; a tip portion integrally connected to the plate-shaped portion and having a larger dimension in a second direction intersecting with the first direction than that of the plate-shaped portion in the second direction; and a slit formed from the tip portion to the plate-shaped portion so as not to reach the support portion of the inspection terminal. The tip portion of the inspection terminal has a first contact portion and a second contact portion that are separated from each other by way of via the slit, and each contact portion is brought into contact with an external terminal of a semiconductor package, and an electrical test of the semiconductor package is performed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RENESAS ELECTRONICS CORPORATION2-24 TOYOSU 3-CHOME KOTO-KU TOKYO 135-0061

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishii, Toshitsugu Tokyo, JP 16 95

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00