Nonconductive films for lighter than air balloons

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11738537
APP PUB NO 20150118461A1
SERIAL NO

14067891

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Non-conductive films for constructing lighter than air balloons are provided. A non-conductive film may include multiple layers of gas barrier polymers. An outer surface printable layer and an interior heat or ultrasonically sealable layer may also be included. Each gas barrier film may include multiple (e.g., from 3 to approximately 75) barrier layers. A gas barrier core has a nano-layer structure. A gas barrier core may also include a biodegradable film or a bio-based film. A non-conductive film may include a metal layer for enhancing gas barrier properties. The metal layer may be discontinuous. The metal layer may be conductive and coated with an insulating top coat.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAN DIEGO GAS & ELECTRIC COMPANY C/O SEMPRA ENERGY101 ASH STREET SAN DIEGO CA 92101-3017

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mount,, III Eldridge M San Diego, US 13 42
Sanford, Denis S San Diego, US 6 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00