Method for the control of the breathing gas supply

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11738216
APP PUB NO 20200406070A1
SERIAL NO

16924911

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a preferred embodiment, methods and systems for the control of the breathing gas supply from a pressure-leading supply conduit to one or more breathing masks of an oxygen emergency supply device in a passenger aircraft include an on/off valve arranged between the supply conduit and the one or more breathing masks. The valve can be blocked or released to control air supply based upon monitoring mass flow to the breathing masks. The valve, for example, is actuated to an open position until the error between the actual mass flow and a desired mass flow exceeds a maximal error value, whereupon the valve is actuated to a closed position until the error between the actual mass flow and the desired mass flow exceeds a minimal error value whereupon the valve is actuated to the open position and the mass flow monitoring cycle is repeated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
B/E AEROSPACE INC150 OAK PLAZA BLVD WINSTON-SALEM NC 27105

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Marz, Heiko Winston-Salem, US 8 18
Sauerbaum, Thomas Groß Grönau, DE 5 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00