Electrical assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11735891
SERIAL NO

17495075

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrical assembly may include a bus bar assembly, a fuse connected to the bus bar assembly, a contactor connected to the bus bar assembly, a bracket connected to the bus bar assembly, and/or a cooling member connected to the bracket such that the fuse is indirectly connected to the cooling member via the bus bar assembly and the bracket. A method of operating an electrical assembly may include controlling the contactor to provide current from a power source to a load, generating heat via the current flowing through the fuse, conducting the heat from the fuse to the bus bar assembly, conducting the heat from the bus bar assembly to the cooling member, and/or dissipating the heat via the cooling member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LEAR CORPORATION21557 TELEGRAPH ROAD SOUTHFIELD MI 48033

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anglin, Aric Rives Junction, US 12 34
Rai, Rutunj Canton, US 24 238
Schmidt, Robert M Livonia, US 39 992

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 22, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 22, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 22, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00