Pressure bulkhead structure with integrated selective electronic switch circuitry

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11733016
APP PUB NO 20210033375A1
SERIAL NO

17075781

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Pressure-isolating bulkhead structures with integrated selective electronic switches circuitry are provided. The pressure-isolating bulkhead structure may be a single unit having the integrated electronic switch circuitry, as well as an electrical connector that includes at least one of a wire and a pin contact. Such integrated selective electronic switch circuitry may be fashioned within a self-contained, inner pressure-isolating enclosure body. Such inner pressure-isolating enclosure body may be produced about the selective electronic switch circuitry such that the inner pressure-isolating enclosure body and switch circuitry are produced as a unit, which can be easily placed within a variety of bulkhead structures, and subsequently within a perforating gun.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DYNAENERGETICS EUROPE GMBHKAISERSTRASSE 3 TROISDORF 53840

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eitschberger, Christian Munich, DE 124 2021
Scharf, Thilo Letterkenny, IE 83 2123

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 22, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 22, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 22, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00