Multi-stage rotor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11732718
APP PUB NO 20220243732A1
SERIAL NO

17761439

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This invention relates to a multi-stage rotor (10). More specifically, the invention relates to a multistage rotor (10) for the compressor stage of a machine that, through a concentric configuration of its innermost (12), outermost (24) and intermediary (16) blade sets co-operative with a reverse flow convoluting ducting arrangement, provides an axially compact, lighter and more easily maintainable compressor rotor for such machine. The multi-stage rotor (10) includes innermost (30), outermost (34) and intermediary (32) duct ports comprising a radial duct spans, as measured between respective diametrically inner and outer duct walls of the duct port, being greater than respective innermost (48), outermost (54) and intermediary (50, 52) radial blade spans of the respective blade sets rotatable at least partially within such duct port. In this manner, a gap is defined between: (i) the at least one diametrical ends of the radial rotating blades ending radially short of the respective radial duct span to form free ends of the blades; and (ii) a stationary part of the respective duct the free ends of the blades sweep neared to; for generating a friction wash between such free ends of the blades and the stationary part of the respective duct.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GAFFOOR FEIZAL ALLI15 TERRACE ROAD FORDSBURG JOHANNESBURG 2092

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gaffoor, Ali Feizal Johannesburg, ZA 1 0
Gaffoor, Feizal Alli Johannesburg, ZA 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 22, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 22, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 22, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00