System and method for modular construction

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11732465
SERIAL NO

17325144

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A building module for use in construction of a building comprising a deck oriented in a horizontal plane and a plurality of hollow structural members extending downwardly from around a periphery of the deck. A method of constructing a building comprising placing a plurality of prefabricated modules according to a floor plan to form a story of the building, pouring concrete into the hollow structural members of the plurality of modules to form structural columns, pouring concrete onto the decks of the plurality of prefabricated modules for form structural slabs, and allowing the structural columns and structural slabs to set to complete the story of the building. Embodiments include a plurality of techniques for sealing adjacent prefabricated modules and for installing a balcony on the prefabricated modules.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PRE FORM SYSTEMSNot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Austin, Douglas San Diego, US 11 50
Isaacs, Scott Calgary, CA 24 1443
Newnham, Darrin Calgary, CA 3 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 22, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 22, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 22, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00