Battery pack including battery cells connected to a printed circuit board substrate via first and second electrode tabs

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11728527
APP PUB NO 20200251702A1
SERIAL NO

16857619

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A battery pack includes: a plurality of battery cells; a printed circuit board (PCB) substrate electrically connected to the plurality of battery cells and including first and second surfaces opposite each other; and first and second electrode tabs electrically connecting each of the plurality of battery cells and the PCB substrate and respectively connected to conductive pads that have different polarities and are located on the first surface of the PCB substrate. The battery pack has an improved structure for easily electrically connecting the battery cells.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG SDI CO LTD150-20 GONGSE-RO GIHEUNG-GU YONGIN-SI GYEONGGI-DO 17084

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bae, Sanghoon Yongin-si, KR 24 401
Kwag, Nohyun Yongin-si, KR 61 428
Lee, Jooyul Yongin-si, KR 10 34
Seol, Jihwan Yongin-si, KR 13 28

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 15, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00