Infrared stove and infrared split stove set

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11725826
APP PUB NO 20210262667A1
SERIAL NO

17139351

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The application discloses an infrared stove and an infrared split stove set. The infrared stove includes an outer casing, an inner cover, an ejector tube, a gas nozzle and an infrared reaction layer. The inner cover is nested with the outer casing to form a stove body. The infrared reaction layer is provided on the stove body. A first accommodating cavity is provided between the infrared reaction layer and the inner cover. A second accommodating cavity is provided between the inner cover and the outer casing. The ejector tube is arranged on the inner cover, communicates with the first accommodating cavity and the second accommodating cavity, and has a gas inlet. The gas nozzle is arranged on the outer casing, and is arranged opposite to the gas inlet and at a spacing. The infrared stove adopts flameless combustion, with more stability, more resistance to severe environments, and better windproof property.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZHEJIANG DEERMAPLE OUTDOOR PRODUCTS CO LTDSOUTHEAST INDUSTRIAL ZONE SHUXI STREET WUYI TOWN JINHUA CITY ZHEJIANG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lv, Qiding Jinhua, CN 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 15, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00