Construction element for a container, door for a container and a container
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Aug 15, 2023
Grant Date -
N/A
app pub date -
Dec 3, 2019
filing date -
Jan 4, 2019
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A construction element includes a first wall, and a second wall. The walls are arranged at a distance from one another, forming a space wherein at least one sheet component is arranged, and where the sheet component is arranged to the first wall and to the second wall, and where concrete is arranged in the space between the first wall, the second wall, and the sheet component.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
CESIUM AB | 641 34 KATRINEHOLM |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Gustavsson, Jack | Katrineholm, SE | 8 | 32 |
# of filed Patents : 8 Total Citations : 32 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- B65D Class
- 0 % this patent is cited more than
- 2 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Feb 15, 2027 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Feb 15, 2031 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Feb 15, 2035 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events

Matter Detail

Renewals Detail
