Method of manufacturing a film comprising microfibrillated cellulose

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11724284
SERIAL NO

16481688

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The method of the invention relates to a method of manufacturing a fibrous, oxygen barrier film by casting a suspension comprising microfibrillated cellulose onto a non-porous substrate in a number of subsequent steps with intermediate drying. The invention enables an efficient method to manufacture an MFC film by casting technology without the problems of cracks or voids formed in the film. By applying the MFC in several layers, with in-between drying, the distance the water has to diffuse through is shorter, whereby the evaporation is more efficient and the film properties are not negatively affected by the drying.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STORA ENSO OYJ00101 HELSINKI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aulin, Christian Stockholm, SE 3 27
Axrup, Lars Hammarö, SE 17 371
Hillergren, Magnus Solna, SE 2 18
Knöös, Isabel Säffle, SE 7 31
Lindström, Tom Sollentuna, SE 6 41
Ström, Göran Stockholm, SE 3 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 15, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00