Method of fabricating a transistor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11721753
SERIAL NO

17362917

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An HFET includes a first and second semiconductor material. A first composite passivation layer includes a first insulation layer and a first passivation layer, and the first passivation layer is disposed between the first insulation layer and the second semiconductor material. The HFET includes a second passivation layer, where the first insulation layer is disposed between the first passivation layer and the second passivation layer. A gate dielectric is disposed between the second semiconductor material and the first passivation layer. A source electrode and a drain electrode are coupled to the second semiconductor material, and a gate electrode is disposed laterally between the source electrode and the drain electrode. A first gate field plate is disposed between the first passivation layer and the second passivation layer and electrically connected to the gate electrode, and a second gate field plate is disposed above first gate field plate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
POWER INTEGRATIONS INCMOUNTAIN VIEW CA 94043

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kudymov, Alexey Ringoes, US 26 120
Liu, Linlin Hillsborough, US 45 410
Ramdani, Jamal Lambertville, US 131 3582
Wang, Xiaohui East Brunswick, US 234 2149

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 8, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00