Flow control valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11719236
APP PUB NO 20220403838A1
SERIAL NO

17520804

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a flow device including an inlet, an outlet, and a plurality of fluid flow paths hydraulically connected in parallel to the inlet and the outlet, wherein the plurality of fluid flow paths forms a first ring of fluid flow paths circumferentially arranged at a first radial distance from a centerline of the fluid flow device a second ring of fluid flow patch circumferentially arranged at a second radial distance from the centerline of the fluid flow device, each of the plurality of fluid flow paths has a first hydraulic resistance in a forward flow direction and a second hydraulic resistance in a reverse flow direction, and the second hydraulic resistance is greater than the first hydraulic resistance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
U S DEPARTMENT OF ENERGY1000 INDEPENDENCE AVENUE S W GC-62 6F-048 WASHINGTON DC 20585-0162

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Siebert, Brett W Niskayuna, US 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 8, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00