Method for manufacturing electrically conductive structures on a carrier material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11718727
SERIAL NO

16496591

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing electrically conductive structures, preferably conductive pathway structures using laser beams on a non-conductive carrier (LDS method), wherein a non-conductive carrier material is provided which contains at least one inorganic metal phosphate compound and at least one stabiliser finely distributed or dissolved therein, the carrier material is irradiated in regions by laser beams generating the electrically conductive structures in the irradiated regions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHEMISCHE FABRIK BUDENHEIM KGBUDENHEIM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fünderich, Sven Norheim, DE 2 10
Flores, Jorge Kronberg im Taunus, DE 7 54
Futterer, Thomas Ingelheim, DE 20 93
Litterscheid, Christian Ober-Olm, DE 7 10
Martinez, David Garcia Saragossa, ES 5 10
Wissemborski, Rüdiger Gau-Algesheim, DE 13 43

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 8, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 8, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 8, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00