Motor controller, motor system and method for controlling motor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11716045
SERIAL NO

17441436

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A motor controller 100-1 includes an inverter, a current detection unit, a current detector, and a PWM signal generator. Upon occurrence of a condition in which a first energization time period, which has an energization width in which a phase current for a first phase is detectable by the current detector, and a second energization time period, which has an energization width in which a phase current for a second phase is difficult to be detected by the current detector, are present, the PWM signal generator extracts a portion of a zero vector period for a first PWM signal, a second PWM signal, and a third PWM signal, to assign an energization width corresponding to the extracted zero vector period, to a period, other than the zero vector period, for a given PWM signal among the first PWM signal, the second PWM signal, and the third PWM signal, so that the second energization time period is adjusted to have an energization width in which the phase current for the second phase is detectable by the current detector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MINEBEA MITSUMI INCNAGANO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Oba, Takashi Tochigi, JP 9 45

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 1, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00