Cocking mechanisms for a crossbow

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11713941
SERIAL NO

17738676

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A crossbow is provided with a reciprocating linear rack and a locking linear rack, wherein a traveler having a pawl for each linear rack is engaged by the reciprocating linear rack to move rearward relative to the locking rack, thereby moving the traveler to a drawn position. A cocking lever is hand operated by the user though a plurality of cycles to move the traveler, and captured bowstring to a fully drawn configuration. A trigger mechanism engage the traveler in the drawn configuration and selectively releases the bowstring from the traveler. A bow assembly is provided, wherein the bowstring wraps about a front edge of opposing rotatable members, to be longitudinally located in front of a portion of power cables. The bow assembly includes a power cable on each side of the stock, and thus the power cables do not cross a longitudinal axis of the crossbow.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CRIST REED INC4655 S HOLLEY ROAD HOLLEY NY 14470

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Crist, Jeffrey A Holley, US 3 119
Read, Thomas J Hilton, US 3 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 1, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00