Nanocomposite body, method of manufacturing the same, and nanocomposite film including the nanocomposite body

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11713403
APP PUB NO 20180346755A1
SERIAL NO

15994132

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are a nanocomposite body, a method of manufacturing the nanocomposite body, and a nanocomposite film including the nanocomposite body. The nanocomposite body includes: inorganic particles; a polymer matrix; and grafting polymer chains each of which includes a polyol structure, wherein the inorganic particles and the polymer matrix are linked by the grafting polymer chains.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG DISPLAY CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO
SOGANG UNIVERSITY RESEARCH FOUNDATION35 BAEKBEOM-RO MAPO-GU SEOUL 04107

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Sungmin Seoul, KR 31 50
Choi, Minhoon Yongin-si, KR 16 55
Kim, Boa Yongin-si, KR 18 84
Kim, Kyungtae Yongin-si, KR 136 924
Kim, Sanghoon Yongin-si, KR 270 509
Lee, Jeoungsub Yongin-si, KR 23 85
Oh, Hyejin Yongin-si, KR 9 16
Oh, Hyunjoon Yongin-si, KR 22 102
Park, Sangil Yongin-si, KR 56 717
Rhee, Heewoo Seoul, KR 7 5
Shin, Heonjung Yongin-si, KR 24 84
Yang, Taekyung Seoul, KR 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 1, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00