Semiconductor substrate support with multiple electrodes and method for making same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11712745
APP PUB NO 20220143726A1
SERIAL NO

17583483

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing an electrostatic chuck with multiple chucking electrodes made of ceramic pieces using metallic aluminum as the joining. The aluminum may be placed between two pieces and the assembly may be heated in the range of 770 C to 1200 C. The joining atmosphere may be non-oxygenated. After joining the exclusions in the electrode pattern may be machined by also machining through one of the plate layers. The machined exclusion slots may then be filled with epoxy or other material. An electrostatic chuck or other structure manufactured according to such methods.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMPONENT RE-ENGINEERING COMPANY INC3508 BASSETT STREET SANTA CLARA CA 95054

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Balma, Frank Los Gatos, US 28 679
Elliot, Alfred Grant Palo Alto, US 26 554
Elliot, Brent Donald Alfred Cupertino, US 20 553
Parker, Michael Brentwood, US 97 1332
Rex, Dennis George Williams, US 25 592
Schuster, Richard Erich Milpitas, US 19 550
Veytser, Alexander Moutain View, US 27 721

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 1, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00