Fusegate with ice-breaking system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11708675
APP PUB NO 20220349140A1
SERIAL NO

17764343

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fusegate for a hydraulic structure includes a trough with walls for attaching the normal barrage at a predetermined height, a pressure chamber provided between a base of the fusegate and the upper surface of the spillway, a means for pressurising the chamber according to a maximum predefined height of a water level upstream of the fusegate, the fusegate further comprising systems for breaking ice which are attached to the gate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYDROPLUS92500 RUEIL MALMAISON

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Del, Rey Franck Jouy-en-Josas, FR 3 2
Perard, Camille Rueil-Malmaison, FR 2 2
Tessereau, Pierrick Tours, FR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 25, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00