Creating 3D mark on protective coating on metal part using mask and metal part so formed

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11707815
APP PUB NO 20210008689A1
SERIAL NO

16505810

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for creating a three-dimensional (3D) mark in a protective coating including at least one of a TBC and a bond coating over a metal part, is provided. The method may include positioning a mask over the protective coating, the mask including an opening pattern therein; and performing an abrasive waterjet process on the protective coating using the mask. The abrasive waterjet erodes a first portion of the protective coating exposed through the first opening pattern to create the 3D mark. The mask is removed, leaving the 3D mark in the protective coating. The 3D mark only partially penetrates through the protective coating. A metal part may include a metal body, a protective coating over the metal body, and the 3D mark in the protective coating, is also provided. The 3D mark in the protective coating may include an opening having a width of between 30 and 300 micrometers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Duval, Sophie Betty Claire Zürich, CH 12 50
Moser, Roland Richard Zürich, CH 7 74

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 25, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00