Fabricating structured particles through rapid hardening and tailored collection methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11707719
SERIAL NO

17450731

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Fabrication of functional polymer-based particles by crosslinking UV-curable polymer drops in mid-air and collecting crosslinked particles in a solid container, a liquid suspension, or an air flow. The particles can contain different phases in the form or layered structures that contain one to multiple cores, or structures that are blended with dissolved or emulsified smaller domains. A curing system produces ultraviolet rays that are directed onto the particles in the jet stream from one side. A reflector positioned on other side of the jet stream reflects the ultraviolet rays back onto the particles in the jet stream.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PURDUE RESEARCH FOUNDATION3000 KENT AVENUE WEST LAFAYETTE IN 47906

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aines, Roger D Livermore, US 40 373
Baker, Sarah E Dublin, US 20 33
Cook, Caitlyn Christian Livermore, US 2 3
Duoss, Eric B Dublin, US 75 459
Kuntz, Joshua D Livermore, US 56 565
Lee, Elaine Brooklyn, US 49 1137
Martinez, Carlos J West Layfayette, US 5 48
Oakdale, James S Castro Valley, US 15 20
Pascall, Andrew J Livermore, US 19 41
Stolaroff, Joshuah K Oakland, US 30 97
Worsley, Marcus A Hayward, US 87 640
Ye, Congwang Livermore, US 13 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 25, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00