Integrated radio frequency transceiver

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11705929
APP PUB NO 20220294480A1
SERIAL NO

17647286

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A direct digital radio having a high-speed RF front end in communication with an antenna, and a radio subsystem that can be configured to form a programmable multi-standard transceiver system. The high-speed RF front including RF inputs configured to receive a plurality of radio frequencies (e.g., frequencies between 400 MHz to 7.2 GHz, millimeter wave frequency signals, etc.) and wideband low noise amplifiers provides amplified signals to RF data converters, analog interfaces, digital interfaces, component interfaces, etc. The programmable multi-standard transceiver is operable in frequencies compatible with multiple networks such as private LTE and 5G networks as well as other wireless IoT standards and WiFi in multi-standard network access equipment. The programmable multi-standard transceiver can greatly reduce complexity for the baseband processing, lower the cost of the overall transceiver system, reduce power consumption, and at the same time, benefit from improvements on the digital functions through integration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ARCTIC SEMICONDUCTOR CORPORATION2216 RINGWOOD AVE SAN JOSE CA 95131

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mehrmanesh, Saeid San Jose, US 23 88
Toosi, Vahid M Los Altos, US 12 18
Veyseh, Marzieh Los Altos, US 23 203

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 18, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 18, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 18, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00